NEW INSTALLATION & RETROFITS
Get code-compliant fire protection installed on schedule with clean workmanship, coordinated trades, and accurate turnover documents. Our union technicians build, retrofit, and commission systems that pass inspections and keep you moving.


WHO WE HELP
We partner with general contractors, construction managers, property managers, facility and safety teams, and owners across Mahoning County. Projects range from core and shell to tenant improvements, change-of-use retrofits, and phased work in occupied buildings near campuses, manufacturing corridors, and medical centers.
We design, install, and retrofit fire protection systems, coordinate with other trades, manage permits and inspections, and deliver complete turnover packages. When schedules are tight, we phase work to keep areas open, pretest systems, and combine inspections to cut repeat visits.
CITIES SERVED

For installation and retrofit projects in Youngstown, we plan work around real site conditions and local approvals. Typical routes include downtown blocks near Covelli Centre, the DeYor Performing Arts Center and Powers Auditorium, Stambaugh Auditorium, and Youngstown State University, where arenas, labs, and residence halls require careful phasing and documented pretests. We coordinate deliveries and crane picks to avoid event load-ins and campus move-in days.
Industrial scopes along I-680, the 711 Connector, Salt Springs Road, and Meridian Road benefit from early planning for shutoffs, hydrant flows, and test header locations so production remains online. Retail and restaurant buildouts in Boardman and Austintown require dust control, quiet hours, and tight water windows during peak service times. Underground tie-ins and backflow approvals are coordinated with the City of Youngstown Water Department, with locate tickets filed through Ohio 811 before excavation. Cold-weather phases include heat tracing checks, enclosure plans, and temporary heat for riser rooms so hydro tests and flushes stay on schedule.
We manage AHJ submittals and inspections through Youngstown Building and Fire Prevention offices, align pretest dates with the water authority, and deliver as-builts, calculation summaries, and acceptance test records that match local expectations at turnover.
Boardman, OH
Austintown, OH
Struthers, OH
Campbell, OH
Canfield, OH
Poland, OH
Lowellville, OH
New Middletown, OH
North Lima, OH
Sebring, OH
SYSTEMS WE INSTALL & RETROFIT
We provide complete installation and targeted upgrades for the systems below.

Design and install sprinkler systems meeting NFPA 13 and 13R.

Engineer standpipe systems and outlets compliant with NFPA 14.

Provide fire pumps, controllers, testing, and startup per NFPA 20.

Install underground mains and backflows per NFPA 24 and codes.
PROJECT TYPES
Comprehensive coverage of new construction, retrofits, and code upgrades.

HOW IT WORKS

We confirm system types, site contacts, and access details. When possible we combine services so you can add fire pump and backflow testing to the same appointment. We set a firm arrival window and offer after hours options on request.

We prepare drawings, hydraulic calculations, and cut sheets where required and submit for AHJ review. Coordination includes ceiling plans, mechanical conflicts, and penetrations. We respond to plan review comments with updates until approved.

Union installers follow site safety rules and keep work areas clean. We coordinate with other trades, verify hangers and bracing, and phase work to match your schedule. Daily communication keeps the GC or owner updated.

We conduct acceptance tests such as hydrostatic tests, main drain and flow tests, alarm function tests, and hood system checks. Your team receives simple training on valves, panels, and testing points before turnover.

You receive as built drawings, a basic operations and maintenance packet, and acceptance test results. We include a limited one year product warranty. If you want ongoing inspections, we set the first calendar.
Pricing is based on drawings or a site survey, device counts, equipment, and schedule requirements. You receive a written, itemized quote before work begins. Scope changes are documented through clear change orders.
Work follows applicable NFPA standards and local code. Reports, tags, and test records are prepared in formats your AHJ prefers. We attend inspections and help resolve comments quickly.
We plan around material availability and trade coordination. Control valves, heads, panels, and devices can have lead times. Early submittals reduce delays. Tell us your milestone dates and we will build the schedule backward.
FAQ
Both. We offer design build and plan and spec installation. We can also value engineer when the goal is a code compliant result with fewer delays.
Yes. We prepare submittals, respond to plan review, schedule tests, and attend inspections until approval.
Small suites can finish in one to two weeks once materials are on site. Larger spaces or complex occupancies take longer. We provide a schedule with milestones before work begins.
Yes. We can connect to central station monitoring and set a testing schedule for weekly or monthly signal checks.
NEED HELP NOW?

1502 Mahoning Ave,
Warren, OH 44483
330-360-1514